Project: Fish Creek Restoration Project
|
|||
| Challenge: Rapidly stabilize a newly constructed channel prior to the reintroduction of flow to comply with Wyoming Department of Environmental Quality and Army Corps of Engineers permit conditions. |
|
||
| Solution: Used Wetland Sod to immediately stabilize the newly constructed streambanks. The erosion control fabric covered the exposed soils on the stream banks, greatly reducing sediment impacts to a Class 1 stream. The mature wetland plants were able to withstand major fluctuations in hydrology during establishment. |
|||
|
|||
|
|||
|
|||