Client
City-County of Butte-Silver Bow, MT
Location
Butte, MT
Year
2018
Stodden Park
Stodden Park was overhauled and the new site design required controlling more stormwater and irrigation runoff and snow melt. Designers incorporated this stormwater detention basin into a park and wanted to soften and naturalize the park aesthetic with native plants.
Before Install
1 Year Later